Annual energy target
Performance target
Electric primary systems
Airtightness
Designed for high performance from day one.
Annual energy target
Performance target
Electric primary systems
Airtightness
Designed for high performance from day one.
One home. One integrated system.
Annual performance
0 GJ
Example net annual energy consumption after renewable energy production.
1
Cut overall energy use
Smarter design, lower loads and reduced air leakage.
Smarter design, lower loads and reduced air leakage.
2
High-performance envelope
Insulation, windows and airtightness work together.
Insulation, windows and airtightness work together.
3
Go electric
Cold-climate heat pump and efficient electric systems.
Cold-climate heat pump and efficient electric systems.
4
Size solar to the home
PV matched to modeled annual demand.
PV matched to modeled annual demand.
5
Manage loads intelligently
Plan for storage, EV charging and future resilience.
Plan for storage, EV charging and future resilience.
Project details
At a glance.
Project Team
BUILDER
Builder Name
ENERGY ADVISOR
Rider Petch · Fluent Energy Consulting
LOCATION
Comox Valley, BC
Envelope
WINDOWS
High-performance triple glazing
WALL / ROOF
Project-specific assemblies
AIRTIGHTNESS
Final blower-door result
Systems + Solar
SPACE CONDITIONING
Cold-climate heat pump
HOT WATER
Heat-pump water heater
SOLAR
Project-specific PV capacity
Why it matters
Comfort, durability and lower energy use without making high performance feel complicated.
Built better from the start.
A short case-study narrative can explain the builder’s goals, key design decisions, any challenges solved during construction, and the final measured performance.